Industrial Subdivision

Project Description

Wade Civil Engineering was engaged by Leda Holdings to construct the internal roadworks for the proposed 42 Lot industrial subdivision over 10 ha located at Cawarra Road, Caringbah. Upgrading of adjacent Meta Street was also included as part of the works.

Scope of Works

  • Installation of erosion and sedimentation control measures
  • Proof rolling and trimming of subgrade
  • Installation of subsoil drainage
  • Supply and placement of basecourse layer under concrete slabs
  • Concrete kerb construction
  • Reinforced concrete slab construction
  • Backfilling and trimming of footpath verges
  • Concrete footpath construction
  • Meta Street half road reconstruction
  • Stormwater pit top construction
  • Retaining walls
  • Stormwater overflow path
  • Linemarking and signage
  • Ancillary works